Kaufman · Kaufman County

Phase I ESA planning for Kaufman properties and transactions.

Organize the property, transaction, timeline, and known environmental context before the next professional conversation.

Start a Kaufman project plan →

Buying a Kaufman development site? Start with what will be delivered.

Before requesting a Phase I Environmental Site Assessment in Kaufman, identify the land in the deal and what condition the seller expects to deliver it in. A site package might show a larger park, utility routes and a concept building. Your purchase could cover only one tract, with access or grading to be finished later. Give the environmental professional the current survey or legal description, the intended use and any work expected before closing.

Kaufman’s economic development corporation lists Kaufman Commerce Park along US Highway 175. That can help you identify the project name and locate the development. The listing does not establish what is included in your conveyance, what is installed on your tract, or how the land was used before the park was marketed.

Use the Kaufman city file to confirm the plan you are working from

Kaufman Development Services publishes a zoning map, and the city provides separate plat and site plan materials. Start with the current tract description and ask which documents correspond to that land. Save the date and version of each record. If the purchase exhibit shows a later subdivision, ask for the recorded or approved document where available and identify anything still pending.

A plat can show lot lines and recorded areas; a site plan may show a proposed building and how it would sit on the land. Do not use a concept drawing to replace a survey or decide which land is being acquired. If the city map and the survey appear to show different boundaries, ask the appropriate parties to reconcile them before authorizing an assessment.

Separate promised infrastructure from the conditions on the ground

Ask the seller to mark which access roads and utilities serve the tract today and which are planned. If the agreement depends on improvements being finished, keep those obligations with the transaction team. The environmental professional needs to know what exists at the time of the visit, what work is expected to change the site, and which areas can be reached.

For example, a proposed service drive may run through a future phase while the current visit must use a temporary entrance. Give the consultant the current entry instructions and the name of the person who can arrange permission. A utility line shown in a marketing package is not confirmation that service has been installed or that land along the route is part of the purchase. Ask who can confirm the installation date and send any dated construction record that identifies the specific tract.

Ask about the tract before the latest grading work

An industrial pad can be easy to identify on a new site plan and still have an earlier history worth understanding. Ask the seller for dated grading drawings, available records about fill or excavation, older aerials or plans, and any prior environmental assessments. Record which phase each document describes. A construction file for another part of the park may explain nearby work without answering what happened on the tract in the deal.

If the land is being graded before acquisition, ask when the work started and what will be finished by the visit. Share the schedule and available records with the consultant rather than trying to interpret changes yourself. An absence of buildings today does not establish that the property was always vacant or that no further information is needed.

Keep a short list of assumptions that can change the scope

Put three kinds of information in the deal file: the land being conveyed, the work the seller has agreed to deliver, and the history known so far. For each, note who supplied it and what still needs confirmation. This can be a few lines on the property exhibit rather than a separate report.

Suppose the lender’s description covers a building pad and a separate driveway tract, but the initial consultant request mentions only the pad. Show both tracts and ask the consultant to confirm the property description in the proposal. If the driveway is an easement instead of land being purchased, explain that and send the relevant exhibit. Let the consultant decide how to consider it rather than assuming the scope from the name of the development.

Review earlier assessments against the current phase

If you receive a prior assessment, compare its site map, dates and scope with the current acquisition before assuming it fits. A report prepared for a parent tract or earlier development phase may contain useful records. It may also predate grading, a new building or a change in parcel boundaries. Provide the complete report and tell the consultant what has changed.

Ask whether the existing information can support the new assignment, what updates may be needed and whether the intended parties can rely on the work. Confirm the lender’s acceptance requirements separately. If the lender needs a signed report before funding, work backward from its review date. Do not leave a change in tract boundaries or reliance terms until the final document package is due.

Send a request that identifies the tract, phase and access date

Start with the legal description or survey, the intended purchase or refinance, and the decision date. Add the present and known former uses, a dated site or grading plan, earlier reports, the lender’s written instructions and an access contact. Mark proposed improvements separately from work that is complete. If a city plan or EDC listing helped you locate the site, include the reference and say what you used it for.

A useful first note might be: “We are buying the east tract shown on the survey. The seller expects to finish grading before closing, but the access road shown in the concept plan has not been built. We have a prior report for the larger property and need to confirm what work applies to our tract.” That gives the consultant facts to check without presenting an assumption as a conclusion.

Use the Project Planner below to organize the information. ClearPath does not inspect the property, determine the scope or guarantee a report date.

Next step

Organize the details you already have.

The Project Planner keeps the first request focused on the property and decision in front of you. Unknown information can be marked as unknown and clarified later.

Step 1 of 6

Let’s start with the property.

Where is the property located?

What brings you here?

This helps us understand the decision in front of you.

What kind of property is it?

Choose the closest fit. You can clarify later.

When do you need to move forward?

A rough timeline is enough at this stage.

What do you already know?

This is optional context. It helps shape a more useful next step.

Where should we send your project guidance?

When you finish, you’ll have a focused project summary for the next professional conversation. Your contact information is only requested after the guidance questions.